State Climate Change Program | Tamaulipas
Technical support to the State Government of Tamaulipas for its State Climate Change Program, published in the State Official Gazette in 2017.

Demonstrated experience
Since 2008, Grupo ESM has contributed to environmental, energy, water and public and industrial infrastructure projects. This selection reflects the actual breadth of our experience.
Conceptual editorial image
Technical support to the State Government of Tamaulipas for its State Climate Change Program, published in the State Official Gazette in 2017.
Analysis and proposed revision of the Regional Environmental Impact Statement and Environmental Risk Study for the refinery residue conversion project.
Social impact studies for Federal Electricity Commission interconnection infrastructure in Papantla, Xalapa and Coatzacoalcos.
Construction of the intermunicipal sanitary landfill, including its access road, electrification and operating offices.
Integrated project development and construction of the municipal sanitary landfill, including access infrastructure and operating offices.
Construction and commissioning of the municipal wastewater treatment plant in Pabellón de Arteaga.
Construction of drinking-water lines, an elevated tank, sanitary networks and wastewater outfalls connected with the Tapias Viejas and Jilotepec treatment plants.
Reengineering of an industrial wastewater treatment plant for a design flow of 3,000 m³ per day in Tepeji del Río de Ocampo.
Ecological study and assessment for SEMARNAT, as part of the OHL/Huaribe project, supporting authorization of the Environmental Impact Statement for the 250,000-hectare Cabo Pulmo project.
Experience spanning environmental impact statements, risk studies, land-use change, hydrology, surveying, geophysics, geology, ecological planning, and site closure and remediation.