Demonstrated experience

Delivered projects. Demonstrated capabilities.

Since 2008, Grupo ESM has contributed to environmental, energy, water and public and industrial infrastructure projects. This selection reflects the actual breadth of our experience.

Conceptual editorial image

01

State Climate Change Program | Tamaulipas

Technical support to the State Government of Tamaulipas for its State Climate Change Program, published in the State Official Gazette in 2017.

02

Residue conversion project at the Salamanca refinery | Guanajuato

Analysis and proposed revision of the Regional Environmental Impact Statement and Environmental Risk Study for the refinery residue conversion project.

03

Electric interconnection infrastructure | Veracruz

Social impact studies for Federal Electricity Commission interconnection infrastructure in Papantla, Xalapa and Coatzacoalcos.

04

Intermunicipal sanitary landfill | Zacatecas

Construction of the intermunicipal sanitary landfill, including its access road, electrification and operating offices.

05

Pánfilo Natera sanitary landfill | Zacatecas

Integrated project development and construction of the municipal sanitary landfill, including access infrastructure and operating offices.

06

Emiliano Zapata municipal wastewater treatment plant | Aguascalientes

Construction and commissioning of the municipal wastewater treatment plant in Pabellón de Arteaga.

07

Water conveyance and sanitation | Aguascalientes

Construction of drinking-water lines, an elevated tank, sanitary networks and wastewater outfalls connected with the Tapias Viejas and Jilotepec treatment plants.

08

Pilgrim’s Pride industrial wastewater treatment plant | Hidalgo

Reengineering of an industrial wastewater treatment plant for a design flow of 3,000 m³ per day in Tepeji del Río de Ocampo.

09

Cabo Pulmo ecological study and assessment | Baja California Sur

Ecological study and assessment for SEMARNAT, as part of the OHL/Huaribe project, supporting authorization of the Environmental Impact Statement for the 250,000-hectare Cabo Pulmo project.

10

Environmental and territorial studies | Mexico

Experience spanning environmental impact statements, risk studies, land-use change, hydrology, surveying, geophysics, geology, ecological planning, and site closure and remediation.